Big Thompson River Restoration at Reach 28

The BTWC is no longer accepting proposals for a design-build river project at Reach 28.

The full RFP package is posted on www.bidnetdirect.com: Big Thompson River Restoration at Reach 28, and also posted here:

Downloads:

BTWC Reach 28 Design Build RFP (large .pdf)

Addendum 1 has been posted on BidNet Direct and is also available for download here: Addendum 1 4.12.2018 plus appendices (large .pdf)

Proposals were due by 3 pm on April 26, 2018.

A mandatory pre-proposal meeting and site visit was held Friday, March 30th at 10 am at the Sweetheart City Winery (5500 W Hwy 34, Loveland CO 80537).

The meeting and site visit provided proposers an opportunity to tour the restoration site and receive clarification ether on-site or through follow-up correspondence. Reasonable accommodations can be made for persons with disabilities if 48 hours of advance notice is provided.

The purpose of this meeting was to discuss this Request for Proposals (RFP) and to provide assistance to consultants in the interpretation of this RFP or any of its terms and conditions. Attendees should be prepared to walk along the river in weather typical for this time of year. All questions and responses will be documented and posted to all interested parties represented at the meeting. Please RSVP to Shayna Jones (shayna.jones@bigthompson.co).”

  • © 2018 All Rights Reserved.

  • ACCESSIBILITY ACCOMMODATION NOTICE   The Big Thompson Watershed Coalition (BTWC) complies with Title VI of the Civil Rights Act of 1964 and Section 504 of the Rehabilitation Act of 1973 guidelines. Ensuring the public’s access to and participating in public meetings is a priority of the BTWC. In the event you are in need of a reasonable accommodation in order to attend or participate in a public meeting conducted by the BTWC, please contact Project Manager Tracy Wendt at (970) 699-2906 or email to tracy.wendt@bigthompson.co within 3 to 5 days before the scheduled meeting date in order to allow the Coalition to better accommodate your request. For TDD service, contact Relay Colorado by dialing 711.   BTWC does not provide assistance or contract with a person or entity that discriminates based on disability.
  • Equal Employment Opportunity: The Big Thompson Watershed Coalition is an equal opportunity employer. We will not discriminate and will take affirmative action measures to ensure against discrimination in employment, recruitment, advertisements for employment, compensation, termination, upgrading, promotions, and other conditions of employment against any employee or job applicant on the bases of race, color, gender, national origin, age, religion, creed, disability, veteran's status, sexual orientation, gender identity or gender expression.

    The Big Thompson Watershed Coalition expressly prohibits any form of workplace harassment based on race, color, religion, gender, sexual orientation, gender identity or expression, national origin, age, genetic information, disability, or veteran status. Improper interference with the ability of the Big Thompson Watershed Coalition’s employees to perform their job duties may result in discipline up to and including discharge.

  • Categories